Yes. Adgo maps a SCADA system to your existing PLCs, HMIs, addressing scheme and reporting structure so an upgrade does not force a rebuild of the wider control system. The supervisory layer is configured to communicate over the protocols you already run.
- Existing controllers: SCADA reads from your current PLCs and RTUs without ripping out field hardware.
- Tag and alarm continuity: Existing addressing is reused so historical trends and reports stay continuous.
- Protocol bridging: Legacy serial sites can be bridged to modern Ethernet protocols without rewiring the field.
A SCADA integration should extend what you already run, not replace it. See the motor control the supervisory layer monitors in action on different applications.