We perform a rigorous factory acceptance test (FAT) on every single panel before it leaves our floor. This includes full electrical point-to-point continuity testing, power-up inspections and a comprehensive I/O checkout.
Because we are also software integrators, we load your custom PLC and HMI programs into the hardware during the FAT, allowing you to see the logic interact with the physical components before deployment, drastically compressing your on-site commissioning time.